Found 56,371 results
Regulation: 18 CFR Part 8
Authorizing Statute: 16 U.S. Code § 825o-1
Agency: Federal Energy Regulatory Commission
Restrictions: 8
Delegation Category: Specific Authority checkmark icon

While 16 U.S. Code § 825o-1 is an enforcement statute, it stems from other delegations in subchapter II that delegate specific authority to regulate particular aspects of hydroelectric projects (such as recreational opportunities). It instructs the Commission on how to assess penalties and takes into consideration certain elements.

Relationship: directly mandated
Beta

16 U.S. Code § 825o-1 explicitly states that it is unlawful to violate any provision of subchapter II or any rule or order issued under such provision, directly mandating the enforcement of regulations. 18 CFR Part 8 does not appear to be directly linked to the specific enforcement statute. However, the CFR does state that its authority stems from 16 U.S.C. 791a-825r. The mandate flows from the statute prohibiting violations of rules or orders issued under subchapter II of the Federal Power Act, which necessarily includes rules regarding recreational opportunities.

Regulation: 18 CFR Part 8
Authorizing Statute: 16 U.S. Code § 824o-1
Agency: Federal Energy Regulatory Commission
Restrictions: 8
Delegation Category: Specific Authority checkmark icon

Subsection (d)(2) of 16 U.S.C. § 824o-1 explicitly directs the Commission, after consulting with the Secretary, to promulgate regulations related to designating and protecting critical electric infrastructure information. This is a specific regulatory task, fitting within the “Specific Authority” delegation category. The statute even uses the language “shall promulgate such regulations as necessary to” which falls under the explicit instructions described in Hickman’s delegation framework.

Relationship: related but neither directly mandated nor explicitly authorized
Beta

16 U.S.C. § 824o-1 empowers the Secretary of Energy and the Federal Energy Regulatory Commission (FERC) to take actions related to critical electric infrastructure security. 18 CFR Part 8 addresses recreational opportunities and development at licensed projects, authorized under broader statutes (16 U.S.C. 791a-825r). While both relate to FERC and energy projects, the statute doesn’t directly mandate or explicitly authorize the recreation-related regulations in 18 CFR Part 8. Thus, they are related but neither directly mandated nor explicitly authorized.

Regulation: 18 CFR Part 8
Authorizing Statute: 16 U.S. Code § 825s-6
Agency: Federal Energy Regulatory Commission
Restrictions: 8
Delegation Category: General Authority sword icon

The statute, 16 U.S. Code § 825s-6, specifically addresses the handling of funds by the Southeastern Power Administration. While it instructs the agency on how to manage these funds (“shall be credited to this account as discretionary offsetting collections”), it does so in a way that is specific to budgetary and accounting practices. It does not explicitly delegate rulemaking authority to regulate a particular area related to its operation. The CFR Title and Parts listed, 18, 1b, 2, 3, 5, 11, 46, 131, 141, 154, 225, 260, 290, 294, 381 suggests that the the Southeastern Power Administration’s has broad discretion on how it implements regulations.

Relationship: related but neither directly mandated nor explicitly authorized
Beta

The statute addresses the Southeastern Power Administration’s handling of funds related to annual expenses. While 18 CFR Part 8 generally pertains to recreational opportunities at licensed projects, which could indirectly involve the Southeastern Power Administration as a power provider with licensed projects, the statute does not directly mandate or explicitly authorize regulations concerning recreational opportunities. They are related in that both pertain to the Southeastern Power Administration and licensed projects within the broader energy and water resources domain, but there’s no direct link.

Regulation: 18 CFR Part 7
Authorizing Statute: 16 U.S. Code § 824a-3
Agency: Federal Energy Regulatory Commission
Restrictions: 24
Delegation Category: Specific Authority checkmark icon

The statute clearly instructs the Commission on specific regulatory tasks: encourage cogeneration and small power production, require electric utilities to offer to sell and purchase energy from qualifying facilities, consult with stakeholders, and include provisions on minimum reliability. It uses terms such as “necessary” and “minimum reliability,” which fits the “Specific Authority” delegation even with open-ended terms.

Relationship: directly mandated
Beta

Subsection (a) of the statute directly mandates the Commission to prescribe rules.

Regulation: 18 CFR Part 7
Authorizing Statute: 16 U.S. Code § 825s-1
Agency: Federal Energy Regulatory Commission
Restrictions: 24
Delegation Category: General Authority sword icon

While 16 U.S.C. 825s-1 discusses the management of funds related to electric power, it does not specifically instruct the agency (presumably FERC) on the task of creating an expedited licensing process for hydropower projects. The statute grants broad authority to manage funds and ensure continuity of service, but the specific method of creating an expedited licensing process falls under the agency’s broader rulemaking authority related to hydroelectric power as cited in 18 U.S.C. 791a-825r. This fits the definition of a general authority delegation, giving the agency discretion to create regulations that further the broad goals of the statute.

Relationship: authorized but not mandated
Beta

16 U.S.C. 825s-1 discusses the management of funds generated from the sale and transmission of electric power, specifically referencing section 825s. While it doesn’t explicitly mandate the creation of specific regulations regarding expedited licensing processes (covered by 18 CFR Part 7), it authorizes the Secretary to manage funds to ensure the continuity of electric service and continuous operation of facilities related to power transmission and sale. Expedited licensing could be seen as a means to facilitate these goals, making the regulation authorized but not mandated.

Regulation: 18 CFR Part 7
Authorizing Statute: 16 U.S. Code § 825s-8
Agency: Federal Energy Regulatory Commission
Restrictions: 24
Delegation Category: Specific Authority checkmark icon

The statute provides a clear instruction to the Southeastern Power Administration regarding how it shall pay certain employees, referencing specific criteria for determining pay rates and setting an explicit limit on the maximum rate. This falls squarely under a specific directive, even though terms like “prevailing” necessitate some interpretation.

Relationship: unrelated
Beta

The statute concerns the specific rates of pay for power system dispatchers employed by the Southeastern Power Administration. The regulation concerns an expedited licensing process for qualifying non-federal hydropower projects and closed-loop pumped storage projects. They are completely unrelated.

Regulation: 18 CFR Part 7
Authorizing Statute: 16 U.S. Code § 825s-3
Agency: Federal Energy Regulatory Commission
Restrictions: 24
Delegation Category: General Authority sword icon

The statute, specifically 16 U.S.C. 825s-3, focuses on rate setting and preventing discrimination in power sales. It does not provide explicit guidance on the process by which hydroelectric projects are licensed or expedited. While 16 U.S.C. 791a-825r (cited in the CFR) grants broader authority, 825s-3 itself is narrow. Therefore, looking at the statute alone, it is a broad delegation of power related to hydropower.

Relationship: related but neither directly mandated nor explicitly authorized
Beta

The statute mandates uniform systemwide rates and prohibits discrimination in the sale of power marketed by the Southwestern Power Administration. While 18 CFR Part 7 pertains to expedited licensing for hydropower projects, it doesn’t directly implement the statute’s rate and non-discrimination provisions. However, both the statute and the regulation are related to the broader topic of hydropower and the Southwestern Power Administration in some capacity, but the statute doesn’t directly mandate the regulation, nor does the statute explicitly authorize it.

Regulation: 18 CFR Part 7
Authorizing Statute: 16 U.S. Code § 824a-2
Agency: Federal Energy Regulatory Commission
Restrictions: 24
Delegation Category: Specific Authority checkmark icon

While Section (c) gives the DOE Secretary power to “recommend industry standards for reliability”, this is given alongside a specific goal (reliability of the electric utility industry), after consultation with the commission, and after opportunity for public comment. Section (a) also mandates specific studies, which supports a category of “Specific Authority” delegation.

Relationship: related but neither directly mandated nor explicitly authorized
Beta

The statute directs the Secretary to conduct studies, request examinations, and recommend industry standards regarding electric utility reliability. The regulation pertains to an expedited licensing process for qualifying non-federal hydropower projects. While both relate to energy and involve the Federal Energy Regulatory Commission (FERC), the statute doesn’t directly mandate or explicitly authorize the specific licensing processes detailed in the regulation. The statute contemplates reliability standards and studies, while the regulation concerns licensing procedures for a particular type of energy project.

Regulation: 18 CFR Part 7
Authorizing Statute: 16 U.S. Code § 824a-1
Agency: Federal Energy Regulatory Commission
Restrictions: 24
Delegation Category: Specific Authority checkmark icon

The statute provides the Commission with a specific task: to consider and potentially grant exemptions to electric utilities from state laws that hinder voluntary coordination aimed at economical utilization of facilities and resources. This is a clearly defined regulatory task, fitting within the scope of a Specific Authority Delegation. The statute outlines the conditions under which the Commission can grant exemptions, which limits its discretion.

Relationship: authorized but not mandated
Beta

16 U.S.C. § 824a-1(a) grants the Commission the authority to exempt electric utilities from state laws, rules, or regulations that hinder voluntary coordination if certain conditions are met. The statute authorizes this action, but it does not mandate that the Commission issue such exemptions in every instance, thus falling under “authorized but not mandated”. The CFR parts listed are related to the Federal Power Act, which governs the regulatory structure within which this provision operates.

Regulation: 18 CFR Part 7
Authorizing Statute: 16 U.S. Code § 824s-1
Agency: Federal Energy Regulatory Commission
Restrictions: 24
Delegation Category: Specific Authority checkmark icon

The statute specifically instructs the Commission to conduct a study and then establish rules regarding incentive-based rate treatments for cybersecurity investments. It provides a clear regulatory task (establishing incentive-based rate treatments) within a defined area (cybersecurity investments) and offers specific guidance like consulting with other agencies. While the phrase “incentive-based” provides some discretion, the overall task is well-defined, satisfying the “Specific Authority” criteria.

Relationship: directly mandated
Beta

Subsection (c) of the statute explicitly states that “the Commission shall establish, by rule, incentive-based, including performance-based, rate treatments… for the purpose of benefitting consumers by encouraging”” (1) investments by public utilities in advanced cybersecurity technology; and (2) participation by public utilities in cybersecurity threat information sharing programs.” This is a clear and direct mandate to establish a rule. The provided regulation 18 CFR Part 7 is unrelated to cybersecurity incentives.

Regulation: 18 CFR Part 7
Authorizing Statute: 16 U.S. Code § 825s-5
Agency: Federal Energy Regulatory Commission
Restrictions: 24
Delegation Category: General Authority sword icon

The statute provides authority related to the Southeastern Power Administration’s management of funds for operations and maintenance. It doesn’t prescribe specific rules on how the expedited licensing process should be run. Although section 825s is referenced, this does not mean the present statute makes a Specific Authority Delegation. It is a broad rulemaking authority and should be considered “General Authority”.

Relationship: authorized but not mandated
Beta

The statute (16 U.S.C. § 825s-5) references section 825s of the same title, indicating authorization for the Southeastern Power Administration’s operations and maintenance activities, including accepting advance payments. While the regulation (18 CFR Part 7) doesn’t directly implement the specifics of advance payments, it falls under the broader umbrella of hydropower project licensing, which is related to the Administration’s function as stated in the statute. The authority listed for the regulation includes 16 U.S.C. 791a-825r. Section 825s falls within the range, thus, the regulation is authorized, but not mandated by 825s-5.

Regulation: 18 CFR Part 7
Authorizing Statute: 16 U.S. Code § 825s-7
Agency: Federal Energy Regulatory Commission
Restrictions: 24
Delegation Category: General Authority sword icon

While the regulation (18 CFR Part 7) cites 16 U.S.C. 791a-825r as its authority, those sections are broad grants of authority related to water power. The specific statute at hand, 16 U.S.C. 825s-7, deals with the Southwestern Power Administration’s funds, not the licensing process. Therefore, it falls under the “General Authority” delegation category as it’s a broad rulemaking authority without a specific regulatory task identified within the statute itself. The CFR authority lists a range of US Code citations that include elements of general authority.

Relationship: related but neither directly mandated nor explicitly authorized
Beta

The statute concerns the Southwestern Power Administration’s ability to manage its funds, while the regulation outlines an expedited licensing process for certain hydropower projects. Although both relate to power and the Southwestern Power Administration, the statute does not directly mandate or explicitly authorize the regulation. They are related because both address the operations of the Southwestern Power Administration and the generation of power, but the statute does not instruct on how the licensing process should be carried out or expedited.

Regulation: 18 CFR Part 7
Authorizing Statute: 16 U.S. Code § 825s-4
Agency: Federal Energy Regulatory Commission
Restrictions: 24
Delegation Category: General Authority sword icon

The authority section of 18 CFR Part 7 references 16 U.S.C. 791a-825r; Pub. L. 115-270. These authorities provide broad rulemaking powers to FERC concerning hydroelectric licensing and do not focus on a specific regulatory task. The broad range of statutory authority indicates a general delegation of power.

Relationship: related but neither directly mandated nor explicitly authorized
Beta

The statute, 16 U.S.C. § 825s-4, concerns the handling of advance payments to the Southwestern Power Administration for work on transmission facilities, referencing the authority in 16 U.S.C. § 825s. 18 CFR Part 7 outlines an expedited licensing process for certain hydropower projects. While both relate to the Federal Power Act and the Federal Energy Regulatory Commission (FERC), the statute doesn’t directly mandate or explicitly authorize the regulation. The statute concerns the financial operations of the Southwestern Power Administration and how it can use funds, while the regulation concerns licensing procedures for hydropower projects administered by FERC. Therefore, they are related through the broader topic of energy and the Federal Power Act, but the statute does not explicitly mandate or authorize the specific regulation.

Regulation: 18 CFR Part 7
Authorizing Statute: 16 U.S. Code § 825s-6
Agency: Federal Energy Regulatory Commission
Restrictions: 24
Delegation Category: General Authority sword icon

The statute provides very specific instructions regarding the handling of funds collected by the Southeastern Power Administration. However, there appears to be a more broad delegation to the Federal Energy Regulatory Commission (FERC) to enact regulations related to the Federal Power Act in sections 16 U.S.C. 791a-825r, as the regulation cites.

Relationship: related but neither directly mandated nor explicitly authorized
Beta

The statute concerns the Southeastern Power Administration’s handling of funds for annual expenses. While the regulation, 18 CFR Part 7, deals with expedited licensing for hydropower projects, it doesn’t appear that the statute either directly mandates or explicitly authorizes this specific regulation. The statute concerns funding and accounting for the Southeastern Power Administration, while the regulation concerns licensing processes for hydropower. There may be a connection because hydropower projects could generate revenue that is then handled under the statute, but it is too indirect to be (a) or (b).

Regulation: 18 CFR Part 7
Authorizing Statute: 16 U.S. Code § 824o-1
Agency: Federal Energy Regulatory Commission
Restrictions: 24
Delegation Category: Specific Authority checkmark icon

The statute provides specific directives to the Commission and the Secretary of Energy regarding the protection and sharing of critical electric infrastructure information, the designation of critical defense facilities, and the issuance of emergency orders. For instance, subsection (d)(2) mandates the Commission to promulgate regulations to establish criteria for designating critical electric infrastructure information, prohibit its unauthorized disclosure, ensure sanctions for unauthorized disclosures, and facilitate voluntary sharing of the information. These are clear and specific tasks.

Relationship: authorized but not mandated
Beta

The statute authorizes the Commission and Secretary to promulgate regulations related to critical electric infrastructure information and to take emergency measures during grid security emergencies. However, it does not mandate all possible regulations in this area, allowing agency discretion within the bounds of the statute.

Regulation: 18 CFR Part 7
Authorizing Statute: 16 U.S. Code § 825s-2
Agency: Federal Energy Regulatory Commission
Restrictions: 24
Delegation Category: General Authority sword icon

16 U.S.C. 791a-825r is listed as the regulation’s authority. This range of statutes provides broad rulemaking authority concerning hydropower licensing but does not prescribe specific regulatory tasks related to expedited licensing processes, which makes it a General Authority delegation.

Relationship: related but neither directly mandated nor explicitly authorized
Beta

16 U.S. Code § 825s-2 deals with the disposition of receipts from the sale and transmission of electric power and the creation of a continuing fund for emergency expenses. While 18 CFR Part 7 relates to the expedited licensing process for certain hydropower projects, it does not directly manage receipts or emergency funds. However, both relate to the general subject matter of electric power. The statute does not directly mandate the regulation, nor does it explicitly authorize the regulation.

Regulation: 18 CFR Part 7
Authorizing Statute: 16 U.S. Code § 825o-1
Agency: Federal Energy Regulatory Commission
Restrictions: 24
Delegation Category: General Authority sword icon

The statute prohibits violating “any rule or order issued under any such provision” of subchapter II. This grants broad rulemaking authority to the Commission without specifying the precise regulatory tasks. Although penalties are detailed, the underlying authority for rules is broad.

Relationship: authorized but not mandated
Beta

The statute makes it unlawful to violate provisions of subchapter II or “any rule or order issued under any such provision,” indicating authorization for regulations, but not mandating any specific regulation.

Regulation: 18 CFR Part 7
Authorizing Statute: 16 U.S. Code § 824j-1
Agency: Federal Energy Regulatory Commission
Restrictions: 24
Delegation Category: Specific Authority checkmark icon

While the statute uses the permissive “may,” it also provides specific instructions regarding the required transmission services, the rates, and the terms/conditions. It also lists specific exemptions and circumstances under which exemptions can be terminated, which suggests a well-defined regulatory task.

Relationship: authorized but not mandated
Beta

16 U.S. Code § 824j-1(b) states the Commission “may, by rule or order, require an unregulated transmitting utility to provide transmission services” under certain conditions. This authorizes the regulation, but does not mandate it.

Regulation: 18 CFR Part 7
Authorizing Statute: 16 U.S. Code § 825q-1
Agency: Federal Energy Regulatory Commission
Restrictions: 24
Delegation Category: General Authority sword icon

While 16 U.S.C. § 825q-1 creates an office and provides the Commission the ability to create rules for compensation of fees, 18 CFR Part 7 does not stem directly from those specifically enumerated powers. Instead, it comes from the general authority granted to the Commission under 16 U.S.C. 791a-825r to regulate hydropower projects.

Relationship: related but neither directly mandated nor explicitly authorized
Beta

16 U.S. Code § 825q-1 concerns the establishment of an Office of Public Participation within the Commission and outlines its functions. While 18 CFR Part 7, under the authority of 16 U.S.C. 791a-825r, deals with an expedited licensing process for hydropower projects, the former section doesn’t directly mandate the specific regulations outlined in the latter. The CFR citation also provides a general source of authority for the regulations. While it helps the public participate in the Commission’s process, it is not directly or explicitly mandated to create a licensing process.

Regulation: 18 CFR Part 7
Authorizing Statute: 16 U.S. Code § 824a-4
Agency: Federal Energy Regulatory Commission
Restrictions: 24
Delegation Category: Specific Authority checkmark icon

The statute provides specific instructions regarding the acquisition of rights-of-way for electricity transmission, laying out detailed criteria (public interest, permits, state approval, consultation with other agencies). This fits the “Specific Authority Delegations” category as the agency (presumably, the Secretary of Energy) is instructed on a specific regulatory task (acquiring rights-of-way) and outlines considerations for that task, even using terms like “public interest.”

Relationship: related but neither directly mandated nor explicitly authorized
Beta

While both the statute and regulation relate to electricity and hydropower, the statute focuses on rights-of-way acquisition for power exchange with Canada, while the regulation concerns an expedited licensing process for hydropower projects. They are related in the general sense of energy regulation, but the statute doesn’t mandate or explicitly authorize the specific licensing processes detailed in the regulation.

Regulation: 18 CFR Part 4
Authorizing Statute: 16 U.S. Code § 825q-1
Agency: Federal Energy Regulatory Commission
Restrictions: 454
Delegation Category: Specific Authority checkmark icon

The statute creates a specific office, assigns its functions, and gives the Commission the authority to promulgate rules for compensating intervenors. This is a specific regulatory task, making it a Specific Authority Delegation.

Relationship: directly mandated
Beta

The statute directly mandates the creation of the Office of Public Participation within the Commission.

Regulation: 18 CFR Part 4
Authorizing Statute: 16 U.S. Code § 824a-4
Agency: Federal Energy Regulatory Commission
Restrictions: 454
Delegation Category: Specific Authority checkmark icon

The statute provides a specific regulatory task to the Secretary, outlining the process and conditions under which they may acquire rights-of-way. Although “public interest” can be an open-ended term, the statute links the determination to the purposes in section 2611(1) and (2), providing a specific directive.

Relationship: authorized but not mandated
Beta

The statute authorizes the Secretary to acquire rights-of-way under specific conditions, but does not mandate that they do so. The Secretary “may” acquire rights-of-way if they determine certain conditions are met.

Regulation: 18 CFR Part 4
Authorizing Statute: 16 U.S. Code § 824j-1
Agency: Federal Energy Regulatory Commission
Restrictions: 454
Delegation Category: Specific Authority checkmark icon

The statute provides the Commission with a specific regulatory task: to regulate transmission services by unregulated transmitting utilities, ensuring comparable rates and non-discriminatory terms. The statute specifically defines “unregulated transmitting utility,” outlines the scope of regulation, and details exemptions. This specificity aligns with the definition of a Specific Authority delegation.

Relationship: authorized but not mandated
Beta

The statute authorizes the Commission to issue rules or orders regarding transmission services by unregulated transmitting utilities but does not mandate such action. The wording “may, by rule or order, require” indicates authorization, not a direct mandate.

Regulation: 18 CFR Part 4
Authorizing Statute: 16 U.S. Code § 825s-3
Agency: Federal Energy Regulatory Commission
Restrictions: 454
Delegation Category: Specific Authority checkmark icon

While the statute itself (16 U.S.C. § 825s-3) does not delegate rulemaking authority, it directly relates to and modifies the pricing structure as defined by 16 U.S.C § 825s. Section 825s gives broad authority to the Secretary of Energy (through the Southwestern Power Administration) to market power and fix rates. This existing framework, combined with the instruction in Section 825s-3 to sell at uniform systemwide rates and not discriminate, provides specific guidance on how the agency should exercise its existing authority to set rates. Section 825s-3 constrains the authority delegated in 825s, but it does so specifically.

Relationship: related but neither directly mandated nor explicitly authorized
Beta

The statute relates to the Southwestern Power Administration and its power marketing, while the regulation (18 CFR Part 4) concerns licenses, permits, exemptions, and determination of project costs for hydroelectric facilities. While both touch on aspects of power generation and transmission, the statute isn’t directly mandating or explicitly authorizing the specific licensing/permitting procedures outlined in the regulation. 16 U.S.C. 791a-825r is cited as the authority for 18 CFR Part 4, which includes 825s, but not 825s-3.

Regulation: 18 CFR Part 4
Authorizing Statute: 16 U.S. Code § 824a-3
Agency: Federal Energy Regulatory Commission
Restrictions: 454
Delegation Category: Specific Authority checkmark icon

The statute gives the Commission a very specific task: to create rules that require utilities to offer to sell energy to and purchase energy from qualifying cogeneration and small power production facilities and includes open-ended terms like “necessary.” The statute provides significant detail on the rules to be created, including the rates for purchase. Thus it is considered Specific Authority.

Relationship: directly mandated
Beta

The statute explicitly mandates that the Commission “shall prescribe, and from time to time thereafter revise, such rules as it determines necessary to encourage cogeneration and small power production.” This is a direct mandate.

Found 56,371 results